TAS Portal
← Documents

Working evidence · reconciled 11 November 2026

Airese owner confirmations — 2 November 2026

Version: 2026-11-02-owner-confirmation-v3. Source: Shane’s direct clarification on 2 November 2026. This supersedes conflicting approval-status and MVP-inclusion wording in earlier meeting reconciliations. Existing implementation, testing and release requirements remain unless explicitly changed below.

Privacy research update — 3 November 2026

Version: 2026-11-03-care-privacy-v1. D-07 research output is complete ahead of the 4 November research deadline. The reviewed primary sources do not support a three-PII-fields-per-table rule or a blanket company-beta privacy exemption. Legal endorsement, policy decisions and implementation acceptance remain open. Current CCC/SCC FAQ is ready for team review; delivery and operational approval remain separate. Approved product choices below are preserved. Notion alignment record.

Approved decisions

Record Approved decision Approval / date provenance Remaining work
D-01 Use password-based sign-in. Decision between Jonas and Shane. Exact decision date was not supplied; confirmed by Shane on 2 November. Implement and test registration, applicable email verification, login, password recovery, sessions/logout and backend ownership. The choice of password versus passwordless OTP is resolved.
D-02 The current provisional snore formula is approved. Approved last week in the meeting with Ervin, confirmed by Shane on 2 November. Exact meeting date was not supplied. Jonas tests, reports back and fine-tunes continuously. Formula approval does not imply completed testing, clinical validation, approval of severity bands or release acceptance.
D-28 Include Night Notes / Morning and Bedtime check-ins in MVP. Approved last week, confirmed by Shane on 2 November. Exact meeting date and original approver were not supplied. Finalize catalog/optionality, session grouping, timezone/midnight and multiple-session rules, prefill and save/reload. Keep journal inputs separate from scoring.
D-29 Include the bedtime reminder in MVP. Approved last week, confirmed by Shane on 2 November. Exact meeting date and original approver were not supplied. Finalize default/editable time, opt-out and permission handling; verify local delivery and timezone/DST behavior. Stored preference is not delivery proof.

Approved provisional formula

The approval applies to the current provisional baseline already represented in the decision pack:

Score = 100 × sqrt(clamp(Pw, 0, 82.5) / 82.5)
Pw = 100 × sum(episode duration × mean snore weight) / recorded audio time
Relative weights = 1.0 / 1.1 / 1.2

Keep the version and input/configuration traceable. Jonas owns testing, reporting back and subsequent tuning. Low/moderate/severe definitions and related copy/screens remain separate open decisions. The user did not provide a new formula, new clinical threshold or completed test result.

Confirmation needed today — Monday, 2 November

These are pending today’s meeting confirmation. None is marked approved by this update.

Approval priorities today

  1. D-19: highlighting the USP and the Listen button.
  2. D-03: low, moderate and severe definitions. Screens are not yet confirmed.
  3. D-14: Request callback behavior, wording and response promise.
  4. D-25: result-screen hierarchy and scope, explicitly added for approval today.

Research due Wednesday

D-07 research output was due Wednesday, 4 November 2026 and was completed on 3 November in the linked research update above. This is a research-output deadline, not a recorded legal approval or release authorization. Review the findings and resolve applicable privacy/PII, disclosure, retention and erasure questions before accepting the relevant behavior. The research owner was not newly specified by this clarification.

Counterparts and synchronization

Notion synchronization will be recorded in the pending/alignment record. EAS-2’s Acceptance Criteria were saved and read back with this shared version; its ticket remains In progress. Other affected criteria must be inspected and read back before being reported synchronized. No ticket closes merely because the decision log is updated.