Atenvia · Planning outlook · Updated 12 November 2026

Baseline the technology.
Then shape the product.

Start with technical discovery and a current-state baseline from 19 November. Use the findings to focus product workshops, while Easmed secures build resources in parallel.

Initial desk baseline · 12 Nov 2026

The first findings are ready for validation

The source review found a mock-data React client, additional prisma CLOUD/admin work on a separate branch, and conflicting architecture proposals. The normal build fails on a Figma asset; the existing asset-stub preview build passes. No operational system or live API path is verified.

Read the technical and product baseline →

The pack separates source evidence, reported operations and proposed workflows; records product scope conflicts; and defines business measures awaiting real observations. This does not mark the 27 November stakeholder review complete.

19 Nov 2026 – 15 Jan 2027 · Proposed windows

The planning sequence

Technical discovery and initial baselining come first, during 19–27 November. Broader product/workflow workshops follow from 30 November, informed by the baseline. December and January reviews cover planning outputs, with no MVP build or launch scheduled.

Product & planningTechnical discoveryHoliday allowanceEasmed resourcing · timing open

Weeks beginning Monday. On smaller screens, scroll the chart horizontally; each row includes its exact dates and proposed lead.

Workstream / proposed lead
16 Nov23 Nov30 Nov7 Dec14 Dec21 Dec28 Dec4 Jan11 Jan
Alignment & evidence collectionShane + Raena · 19–24 Nov
Technical discovery & initial baselineShane leads · 19–27 Nov
Product & workflow workshopsRaena leads · 30 Nov–11 Dec
Synthesis & combined planning baselineShane + Raena · 14–18 Dec
Holiday allowanceAsync work only, if available · 21 Dec–1 Jan
Validate & prepare handoverShane + Raena · 4–15 Jan
Secure build resources in parallelEasmed · begin in November; appointment date open

The outlined resourcing bar shows parallel attention throughout planning, not an appointment deadline or a confirmed vendor. No critical workshop or approval is assumed over the holiday period.

27 Nov · proposedInitial technical baseline

11 DecInitial findings review

18 DecFirst planning baseline

15 Jan · proposedValidation & handover review

Access and brief review: 24 November. Emerging product priorities: 7 December. The 15 January endpoint requires agreement; IMDA obligations may require a separate delivery response.

Actions to arrange · Completion not yet verified

Next steps

Start with technical evidence, source material and IMDA obligations; then focus the product workshops. The owners and target windows below are proposed for coordination.

Action & expected outputProposed ownerTarget
Confirm the actual IMDA obligationObtain the governing date, required deliverables, acceptance evidence and approved variations. Map each obligation to planning, Easmed decisions or the future build team.Easmed sponsor / Gary or Ervin
Shane + Raena consolidate
Opening alignment
19–24 Nov
Book technical-owner sessions firstArrange the initial technical/data-owner sessions and one substantive session per week. Book broader clinic/TAS product workshops from 30 November after the baseline review.Raena, with EasmedArrange before 19 Nov
Brief review: 24 Nov
Validate the initial desk baseline with source ownersReview the completed desk/source pack with Easmed’s technical/data owners. Confirm the supported branch, actual environments, data authority and API gaps; extend the initial maps and risks with their evidence. Not a comprehensive engineering audit.Shane + Raena
Pam and technical/data owners contribute
19–27 Nov
Baseline review: 27 Nov
Prepare prisma CLOUD demo accessConfirm Easmed’s requested subdomain, organisation, country/time zone and nominated administrator’s name/email. Review the guide against Atenvia’s data needs. Demo access is offered, not provisioned; use fake devices and synthetic data only.Raena + Easmed’s nominated administrator
Shane reviews technical requirements
Details: 19–24 Nov
Guide review: 19–27 Nov
Recommend additional build resourcesBrief Easmed on engineering, technical leadership, testing and operations capabilities needed. Easmed owns funding and appointments; invite its technical lead into discovery when appointed.Shane + Raena prepare recommendation
Easmed secures resources
Begin during November discovery
Review progress: 18 Dec
Agree capacity, review dates and the planning endpointConfirm Snoraire handover reserve, holiday availability and proposed January handover. Kedar provides optional targeted input.Shane + Raena, with Easmed24 Nov review
Revisit at 11 Dec findings review

Scope and capacity

8 days each / monthPlan for Shane and Raena

15–20% reservedSnoraire handover, from 10 days each

1 workshop / weekRecommended rhythm, plus synthesis

What we deliver

A product brief, workflow and system/data maps, prioritised requirements, technical options, risks, open decisions and a handover brief for Easmed’s future delivery team.

Our allocation includes preparation, interviews, analysis, documentation, coordination and reviews. Prorate November and confirm holiday availability. Kedar’s involvement is limited; polished UI designs are not a dependency.

What Easmed needs to secure

Additional build resources and the authority, budget and access they need. That team validates implementation effort and delivery dates. This engagement covers planning only: no MVP implementation, connector development, deployment or operational pilot.

Easmed stakeholders are assumed available. The exact IMDA date and evidence requirements still need confirmation. If a working product is required, the planning pack alone cannot satisfy that obligation.

Source plan: 2026-11-12-atenvia-timeline-v4 · Portal view updated 12 Nov. Full planning document · Notion product home · EAS-89 discovery & planning · EAS-16 planning brief

Official-source review · 12 Nov 2026

API specifications: what we can review now

Begin with Zoho and prisma CLOUD documentation. For the other platforms, request the current interface specification before assuming API access or estimating an integration.

Platform & sourceAvailabilityDiscovery action / limit
Zoho CRMAPI referencePublic, detailed API specsEndpoints, metadata, schemas, OAuth scopes and limits are documented. Confirm Easmed’s schema, edition and sample-data sandbox through its CRM administrator.
prisma CLOUDGetting-started guideDetailed documentation behind shared loginGetting-started guide access was verified. Tenant account, API token, data coverage and production rights remain separate. Credentials are excluded.
ResMed AirViewIntegration overviewPublic overview; detailed spec to requestExchange/Extract capabilities are described in older EMEA material. No public endpoint/schema contract was found; request current APAC specs through Easmed’s ResMed representative. Singapore eligibility remains unverified.
CloudPATOfficial manualPublic interoperability material; detailed spec to requestOfficial documentation mentions FHIR/Redox but supplies no developer-level endpoint/authentication contract. Ask the representative or CloudSupport@itamar-medical.com which interface is available to Easmed.
NeXus360 / SomfitProduct / integration overviewPublic HL7 material; detailed spec to requestHL7 integration is described, but no public developer API contract was found. Ask Compumedics for the supported API, HL7 or export specification and Singapore availability.

“No public spec found” records the result of the official-source search, not proof that private documentation does not exist. Public capabilities do not establish Easmed’s tenant/API entitlement. Credentials are excluded. Full specification/access register · 2026-11-12-atenvia-api-register-v1

Next: establish the technical starting point

Review existing code and architecture, map system/data ownership, and record which interfaces are documented, accessible or still unknown. Review that initial baseline on 27 November before the broader product workshops. Vendor specifications and access requests can continue in parallel; missing access stays an explicit gap. Any code-based technical experiment remains separately scoped.

New evidence · 12 Nov 2026 · Documentation access verified

prisma CLOUD: a concrete discovery path

The vendor supplied a getting-started guide and offered a demo tenant with fake devices. The guide is accessible. Easmed’s tenant, API token, data coverage and production rights still need verification.

Review during technical discovery

Map the documented therapy-data, access and report capabilities to Atenvia’s needs. Capture identity matching, permissions, synchronisation and report-handling questions for the future delivery team. This is documentation review within the current plan.

Prepare the demo request

Easmed needs to confirm the subdomain, organisation, country/time zone and administrator’s first name, last name and email. The vendor prohibits real patient data in the demo. No request has been sent and no account is provisioned.

The guide credentials are not tenant API credentials and are excluded from this portal. Any hands-on technical experiment requires separate agreement. The referenced non-technical presentation was not supplied for review. Technical discovery record · 2026-11-12-prisma-api-discovery-v1

Earlier discovery and implementation proposals

The dated records below are retained as background. Their staffing, implementation and release assumptions are historical where they conflict with the current planning-only scope above.

Earlier direction recorded before the current planning-only engagement: current discovery defers scheduling; Gary’s clinic-workspace/report-scope sign-off remained open.

27 October · Pam discovery · 2026-10-27-atenvia-discovery-v1

A clinic workspace, with Zoho and source reports

The later discovery session describes a Singapore-only B2B workspace for clinic teams and TAS. Patients do not log in. The proposed core is role-based access, analytics/reporting and downloadable reports. Gary still needs to sign off the first version and its grant mapping.

Current direction

  • Zoho owns patient onboarding. Only confirmed patients flow into Atenvia; leads stay in Zoho until eligible.
  • Clinic/location membership governs access for doctors, nurses and sleep technicians. Approve the exact super-admin, clinic-admin and clinical-user permissions and patient scope.
  • A clinician can request a report; TAS can upload the source vendor PDF for authorized viewing and download. Manual upload is a proposed first path while API access and cost remain unresolved.
  • Keep source diagnostic reports separate from ongoing PAP compliance reports, with patient/device matching, report period, units, provenance and audit.

Deferred or outside the proposed V1

  • Scheduling is deferred during the Zoho Bookings migration. The earlier referral-and-booking slice below is historical.
  • Alerts are proposed for TAS internally, rather than doctor notifications. Exact triggers and response owners remain open.
  • Patient sharing, device recommendations, patient login and markets beyond Singapore are outside this proposed first slice.
  • AI PDF parsing and calculations across several reporting periods remain research. No extraction accuracy or aggregation formula is approved.

What we need to agree and prove

Confirm Gary's scope decision, a pilot clinic and daily users, the data/permission contract, note ownership, PDF feasibility and vendor-specific constraints. The stated 70% private-clinic adoption aspiration needs a denominator and time period. A view-only AirView account for Jonas is a recorded follow-up, not verified access or API authority.

The meeting says work resumes next week. Reconcile the week of 2 November with the earlier post-Airese staffing plan before committing capacity. This session supplies discovery findings, while client scope approval, a real workflow observation, data-path proof and pilot acceptance remain open.

Source: 27 October, 15:42 · discovery with Pam. Granola returned an AI-generated summary; full transcript access is unavailable. Vendor walkthrough observations and clinical metric examples are not approved technical contracts or clinical rules. Earlier records below retain their dates and are historical where they conflict with this update.

Earlier staffing plan: 26 October

The 26 October meeting records Raena and Kedar beginning discovery, with Pam facilitating doctor access and vetting the questions. Shane stays focused on Airese through MVP launch, then transitions to Atenvia. The earlier review did not include the later Pam discovery session, whose findings now appear above.

Shane is assigned to arrange an in-person kickoff after Airese launches, with Audrey attending. We need to confirm the client product owner and decision mandate, technical lead, sponsor, release scope and success metric. The notes call for Ervin to attend weekly product meetings or formally delegate to Gary; that mandate remains to be confirmed.

Decision packs should set out options, trade-offs, a recommendation and an agreed decision date. If a decision is missing at that date, the affected item pauses. Mid-November and February are planning references; these notes do not approve an Atenvia launch date or the referral-to-result proposal below.

This is a staffing dependency on Airese launch, not a required integration between the products. The later discovery assignment updates the 13 October suggestion to wait until Airese ships before starting any design work.

Earlier meeting context

13 October: scope, success and sequencing

The operating-model discussion called for agreement on November and February scope and success measures. February 2027 was discussed alongside IMDA and Atenvia; grant criteria, estimates and client approval still need confirmation.

The product/design discussion proposed sending Kedar Atenvia background after Airese V1, with no design work beforehand. The 26 October internal plan later permits Raena and Kedar to begin discovery in parallel. Neither note validates the existing prototype as the implementation base.

8 October: handover and delivery visibility

The handover meeting called for one delivery view covering each product's PRD, technical work and marketing, with tangible deliverables, blockers and explanations. The later 26 October plan clarifies when Shane transitions to Atenvia.

6 October: vendor access still needs proof

The deployment and data discussion reported AirView and Löwenstein portal access, with Wei Jian assigned to connect Shane with Pam for permissions. Portal access does not establish API access, an integration agreement, usable exports or a working Atenvia data path. Confirm the exact vendor service and permissions before estimating integration work.

29 September: Zoho connection test assigned

The API setup meeting records a connection named Atenvia-API and assigns Shane to test it. The notes reviewed contain no successful Atenvia query or import receipt. Credentials are excluded from this update.

Sources and follow-up

Reviewed 27 October 2026 using Granola's accessible AI summaries. The connector covers only the last 30 days and does not provide full transcripts on this plan. Six earlier meeting notes are linked here, alongside the later Pam discovery above; older meeting agreements have not been freshly checked.

Working counterparts: Atenvia product home and EAS-89 discovery and go/no-go. We still need discovery findings, confirmed responsibilities and dates, and an approved first-release decision.

Historical September referral-to-result proposal

The first slice

Prove the referral handoff with one clinic and TAS operations. Start with manual PDF results. The existing mock-data prototype is a reference for presentation; the secure workflow still needs implementation and validation.

Clinician

  1. Sign in and enter the minimum patient and referral details.
  2. Confirm that the patient has been informed.
  3. Submit the referral and track its status.
  4. View or download the published report and acknowledge review.

TAS operations

  1. Review the referral and request missing information.
  2. Confirm, change or cancel the appointment.
  3. Record test completion, upload the source PDF and enter agreed result fields.
  4. Review if required, then publish the result.

Pilot administrators invite or disable users, assign clinic roles and review access issues.

What the pilot must prove

  • The clinic completes referral to result without a phone call or manual re-entry on the happy path.
  • Patient access is scoped on the server and every sensitive action is audited.
  • Two users cannot confirm the same slot; upload or publication failures recover safely.
  • A clinician can find the published source report and acknowledge it.
  • The workflow reduces coordination effort for the pilot clinic.

These are proposed acceptance criteria, not completed test results.

Decisions before a real pilot

  • We need to name the clinic, clinicians and TAS operations participants.
  • We need to agree the scheduling authority and minimum identifiers, referral fields and result fields.
  • We need to confirm whether publication requires a second reviewer, which notifications are acceptable and the result turnaround target.
  • Privacy owners must confirm hosting region, controller roles, retention, deletion and correction rules.

Real patient data stays out of analytics, logs and non-production environments. Email prompts contain no patient health data. Product, operations, clinical, privacy and the pilot clinic must agree the baseline before pilot entry.

How we get there

  1. Validate one real workflow with the clinic and TAS; test a low-fidelity prototype using synthetic patients.
  2. Build a secure staging flow with scoped roles, referrals, appointments, report uploads and audit events. Use synthetic data.
  3. Run isolation tests and moderated UAT, then complete operational, clinical and privacy readiness checks for a named pilot group.
  4. Prove one import path after measuring pilot friction and confirming source access. Retain provenance and the manual fallback.

The source spec does not commit an implementation or launch date.

Details for review

States and exceptions

Draft → Submitted → Scheduled → Test completed → Result ready → Closed. “Needs information” and “Cancelled” are separate states. State changes are validated by the server, with append-only history.

The interface must cover stale slots, concurrent edits, interrupted uploads, expired sessions and safe retries. Preserve entered referral data when booking fails.

Minimum data and report access

Record clinic and user roles; minimum patient identifiers; referral reason and attestation; appointment source and state; immutable report version and checksum; publication and acknowledgement timestamps. Discovery must settle the exact fields.

Use encrypted storage and short-lived authorised downloads. Audit views, downloads and changes without copying clinical content into logs. Disabled users lose access and active sessions are revoked.

Later phases

Live CPAP feeds, AirView, PrismaCloud, CloudPAT and NeXus360 integrations, automated diagnosis, a patient portal, advanced analytics, multi-country rollout and broad admin tooling remain outside the first slice.

Proposed UAT targets

Stakeholders still need to confirm these: every pilot participant completes the core scenario; median referral submission takes no more than three minutes once details are available; median result retrieval takes no more than one minute from sign-in; zero access-isolation failures and full coverage of defined audit events.

Retain participant role, environment/build, scenario outcome, task time, assistance, access-control evidence, issues and the pilot go/no-go decision.