Finalise scope with Jonas and prepare PRD for Gary
V2 drafted from meeting notes. Scope agreement and stakeholder send remain separate; nothing sent.
Draft list built from meeting notes, 8 September to 8 October. Verbatim transcripts and older history were not available. Owners and dates are as recorded in the notes; whether an item has since been done still needs checking. Nothing was sent and no accounts were changed.
V2 drafted from meeting notes. Scope agreement and stakeholder send remain separate; nothing sent.
The meeting does not assign the scheduling action. Tracker records Jonas delivering methodology and Shane accountable.
Review the actual prototype; no completion evidence in the notes.
Lock insight, score hierarchy, CTA treatment and Night Notes placement.
Align the care handoff with design and the operations contract.
Twelve-hour stop recorded; eight-hour default still under consideration.
Silence must not look like a frozen player.
Historical request; verify receipt before duplicating design work.
Limited design capacity: confirm which deliverables unblock launch.
Example Sound Score 88 is not an approved cutoff; three nights is a recommendation, not a callback lock.
Methodology, benchmarks and approved wording remain open.
Review evidence against the accepted profile; meeting performance claims are not independent acceptance.
Recorded action is to contact Wei Jian/Gary, with Kedar/Jonas copied. Keep as a to-do; no email sent.
Confirm owners, country routing, response expectations and failure route.
Onboarding versus pre-handoff is open; validate purpose, units, consent and data access.
Current form lacks app pre-fill and source attribution. A UTM string alone is not identity.
Source notes say pending finalisation tests. Verify current branch/merge and deployment before calling complete.
Release/DevOps coordination is Shane’s scope. Build, upload, store processing, installation and public release are separate gates.
A local cost model/report exists. Confirm it answers the requested architecture and is reviewed; avoid creating duplicate calculation work.
Age, gender and geography were discussed; scope the exact requirements and permitted data.
Tie funnel gates to measured data, not only engineering completion.
PostHog, Clarity and the Zoho-bundled alternative were discussed. Do not treat tool choice or dual-sending as agreed.
Exact model/OS/build cells, overnight battery, crashes and microphone behavior need physical-device evidence.
Verify existing tester group before creating another; do not publish private phone numbers.
Consumer-facing page: inform, educate and capture interest. This delivery hub is a separate page.
Collect team questions, especially privacy, retention and non-diagnostic limits.
Check approved destinations and copy before consumer publication.
Do not publish “safe/danger zone” or all-local claims without evidence and an accurate data-flow explanation.
Asset testing is distinct from the app onboarding A/B flow that was cut from MVP.
Coordinate with Ziyang and Maha; confirm content pillars and responsible wording.
Use CS evidence to inform the journey; no new medical claim or duplicate profile feature implied.
Historical request; verify current team access and spelling/role before follow-up.
Record the handoff without assuming the stated date proves delivery.
Separate November Airese scope from Atenvia grant/demo and later workflow commitments.
Infrastructure review is already marked done separately; this action asks for account/organisation confirmation.
Privacy owner must determine applicable requirements; meeting references to HIPAA/NHR are questions, not certification.
A prior export exists locally. Verify the exact target and connection outcome before calling this request complete. Never copy credentials into the tracker.
Confirm actual roles and intended systems; a plan to release an account is not an access grant.
Portal access and API/data integration rights are separate.
Verify the exact vendor names and scope before outreach; meeting names are ambiguous.
Historical session request; check the research, doctor needs and recordings were handed over.
Capacity planning only; no hire or spend authorised.